Bob and Weave growing

| No Comments

Bobweave2The Bob and Weave shawl is now on 5.5 mm needles and growing rapidly.  I finished the first of four balls of yarn this morning.  I don't think it will grow quickly enough to have it finished in two more weeks though.  Oh well.  It is providing good stress relief.

My bean plants now have flowers from top to bottom and many young beans.  They haven't managed to grab on to the Birch tree - the branches finally looped over the hook at the top and are hanging down.  Even these branches have flowers on them and will be productive.  I discovered two toadstools in the Lemon Thyme's self-watering pot yesterday morning.  Perhaps I've been giving it too much water.  I don't think it's one of the fungi that is causing my hay fever (if it is fungal spores - I'm not actually sure) since it's better at the moment.

I'm off to try making this Caramel Fudge recipe.

Leave a comment

Work in Progress

Archives

Powered by Movable Type 4.23-en

About this Entry

This page contains a single entry by Jen published on February 20, 2005 4:37 PM.

Garden, Knitting and Weaving Update was the previous entry in this blog.

Show time is the next entry in this blog.

Find recent content on the main index or look in the archives to find all content.

Podcasts


Cast On

Lime & Violet

Sticks and String